Guidance needed: upgrading production OpenZiti 1.1.15 on GKE to current LTS

Hi all,

I'd appreciate guidance on the safest way to upgrade our production OpenZiti network with minimal downtime.

**Current versions (GKE, single non-HA controller):**

- Controller: Ziti 1.1.15 — Helm chart `ziti-controller` 1.1.5

- Routers (public + private): Ziti 1.1.15 — Helm chart `ziti-router` 1.1.3

- Dev controller + router in the same namespace: same versions

- `ziti-console` chart 0.5.3 (app 3.1.0)

- `zrok` chart 0.2.6 (app 0.4.40)

- `ziti-host` chart 1.0.1 (app 1.3.9)

- `ziti-edge-tunnel` chart 0.0.13 (app 0.22.26)

- cert-manager / trust-manager: [subcharts of ziti-controller / separate releases]

- ~500 identities, including ~27 Linux ziti-edge-tunnel IoT devices on pinned versions

**Target:** current 2.0.x LTS.

What upgrade path and steps would you recommend for this setup? Any pitfalls I should watch out for?

Thanks!

id run the dev namespace first as a dry run, and snapshot the prod controller db and pki before touching it, that migration is one way. controller first, routers after, the pinned tunnelers can stay where they are for now.